This project aims to site formation works for the Kwu Tung North New Development. One of its majority works includes construction of road and associated road drainage system. There are more than 50 nos. of special manholes with sizing at least 3500 x 5000 footprint are required with numbers of utilities and pipes intersecting the manholes. The works Is to design, supply, deliver and site assembly of one special manhole with a footprint of sizing 4500 x 5500 (mm2) on plan x 5600 mm (H) with two backdrops (2100mm wide and 750mm wide respectively) within 3 months.