This project aims to upgrade existing cast-insitu Steel Twin Lift Towers (2 units) to MiC Lift Towers. Apart from traditional MiC Construction in the past, the Lift components will also be installed in the modules in factory for minimizing the works for MEP installation on site. MiCON is responsible for structural design ease for factory fabrication for both architectural, structural and MEP aspects, logistic and site assembly construction.