This project aims to improve the drainage system in TST district and associated enhancement works. One of the highlights is to build a toilet to replace a substandard toilet in TST. The toilet is going to be designed and built using MiC Method. MiCON involved in the Structural detailed design feasible for construction, coordination with factory for shop drawings and fabrication process.